Update for the week. Not a lot of actual work going on but started to prep the new replacement parts. Pressed my first hub together and forgot the outer wheel grease seal. Oops. Got it fixed and the first front hub is pressed together with the retaining snap ring and both seals!

8FF54758-DF62-4C84-A530-64B624311DDA.jpeg
D67F8AE1-6179-4E41-B0FB-A2E1BBE74EF9.jpeg

Pedal box is done with new WRX covers installed!

0FA57D21-35C4-4226-8DF8-1A3EBC903017.jpeg

And ordered tubular unequal length headers for NA 2.5i engine.

A4647ADE-DD13-4187-A9A7-444799AF4B7A.jpeg

Talked to the machine shop this week and they said our heads had no cracks and no leaks! They just need to plane the surface and clean the valves and set the gap/lash. Hopefully get those back next week.

And most important update...our kit is now fully paid for and should be ready to ship in about 2-weeks!